The second tank is the same size as our stainless steel one, but is dug half under the ground to bring it below the roofline so that gravity will fill it. The water will run down the downpipes (with screens at the top), along a pipe under the ground, then back up the pipe on the side of the tank. Though the pipes will remain filled with water (there is a drain on the other side to flush them periodically), the screens will keep mosquitoes or bugs out.
Now all that is left really is connecting up the hot water and temperature test, clean up, and the final council inspection. We still don't expect to be in before the end of the month, what with paperwork etc, and getting the flooring done. Hopefully the end is in sight now though.